mapsedge: Me at Stone Bridge Coffee House (Default)
The day was productive, but not in the way I thought it would be. I had thought I'd get a dye job done and maybe assemble the tights once the fabric was dry, but I just decided to get the basement wiring project finished. That's the way things typically get done around here: I Just Decide to get something done and I work on it until, 1. the projects actually does get done; 2. I run out of money; or 3. I run out of time.

For years - decades, really - to have light in the basement where my shop is has meant pulling a cotton string attached to an ancient ceramic bulb socket, and there were four. Two of them had four-foot fluorescent lights plugged into them so there has always been plenty of light, but you had to walk through a dark basement to turn on the light farthest from the door. Kind of a pain. There was one set of lights actually controlled by a switch, but the switch was placed in a spot convenient for the way I once had the shop configured Way Back When, but not for several years since.

When we first made Seamlyne a business back in 2000 - officially, not the paying hobby it was for a decade before that - we bought two commercial sewing machines on credit. No way those could go upstairs, so I began the process of finishing the basement as well as I could. The job is about half done, having reached a point of stasis: done enough that it looks like an actual room instead of a concrete block dungeon, as long as you don't look between the shelves at the back. With carpet, pictures on the white-painted walls, a table lamp, and track lighting to supplement the harsh task lighting over the cutting table, it can be quite comfortable down here (where I happen to be writing from at this moment.) There's even a worn old loveseat, much the worse for wear, but still sittable.

If you count the spare refrigerator, a hotplate, and large plastic shop sink, there's even a rudimentary kitchen. It's got all the amenities except for a bathroom, which I simply don't have the money for - below grade, it would have to be a toilet that pumps waste up, and those are très expensive.

...except for light switches by the door. Now we have them. I divided the basement into two zones: laundry, close to the door; and shop, away from the door. The exposed ceiling is starting to look like a bowl of noodles, but I'm okay with that. It's messy but safe, and all to code, or will be after I go to Lowe's to pick up covers for the junction boxes. 

-------------------------------------------------------------------------------- 

Michelle woke without a headache for the first time in about two weeks, and so We went to the Nelson Atkins Museum, our first family outing in quite a long time. The kids loved it for about the first half hour. Jami particularly liked the Egyptian section, especially the mummy. Surprisingly, Katie liked the Asian section.

Before we left for the museum, Michelle started to feel the headache and so took a preventative dose of medicine. Before we left the museum, however, her headache spiked and we were constrained to get lunch to go and just come home. She took a percocet and retired to the family room. Since a dye job can't really be interrupted once started, and since I didn't know if we'd be making a trip to the ER for Even Heavier Meds, I came downstairs to install light switches.

I can already see what I want my next wiring project to be, though I'm in no rush - it's just a re-route and not critical. The circuit I tied into for the laundry-side lights also powers the furnace, and I want the furnace to have its own. I'll run another 15amp circuit if I must. I know how at least.

-------------------------------------------------------------------------------- 

As to the tights, I'll make them tomorrow. 
mapsedge: Me at Stone Bridge Coffee House (Default)
It was a very busy weekend. I didn't get everything done I wanted to, but then that's usually the case.

Congregation Beth Torah is hosting an American Library Association exhibit on Jewish influences in American popular music. Saturday night was a musical revue with narration as a kind of kick-off. I was the male narrator, a young lady named Gloria the female narrator. It was great fun, and the largest audience I have ever performed for in my life. I'm guessing about six hundred people were there. It was great fun: having to pause in the middle of your lines to let the laughter crest is very gratifying. It was Lezlie Revelle who got me involved - she wrote the male narrator part with my voice in her head. 

That was most of Saturday. Since our final rehearsal was mid-afternoon with a performance in the evening, I didn't want to start any projects. I puttered around, dropped off a load of recycling, burned a couple of DVDs for my father-in-law. 

I'm afraid my suit has reached its physical limits. If I gain any more weight, I'll have to buy a new one. Cheaper to lose twenty pounds.

---------------------------------------------------------------------- 

Michelle is on day seven of a migraine. She's keeping the meds going but they help only a little, and I'm afraid this one is just going to have to run its course. 

----------------------------------------------------------------------  

Sunday, I did start a project I've been wanting to do for some time: putting the downstairs lights on switches by the door. Right now, if you want lights in any given area, you have to pull a string on the fixture for that area. Kinda stupid in a basement I'm working to finish. The basement can be divided into two zones: the half by the door, and the other half. The Half by the Door includes the washing machine and dryer, and that would be one switch. The Other Half includes the sewing machines and cutting table. I installed that switch yesterday, which was really just moving a switch that was already there but in a really inconvenient spot. I've got another fixture to tie into that circuit - I hope to do that tonight.

For the switch by the door, I'm going to have to get creative. The ceiling area of the basement is starting to look like a bowl of noodles, but the wiring was pretty haphazard to begin with. I wish I had time for a complete rewire, but it's not really worth it even if I did.

----------------------------------------------------------------------  

Seamlyne has hit its slow season, and I'm grateful for the break. It's allowing me time to get other things done. I've a new kitchen cabinet to finish and install that will add another four feet of so of counter space. I've got the basement stairwell to finish. There's a shed I need to start on, and a place in the driveway that needs to be filled in with something before it becomes large enough to swallow a vehicle.


June 2023

S M T W T F S
    123
45678910
11121314151617
1819 2021222324
252627282930 

Syndicate

RSS Atom

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 20th, 2025 20:21
Powered by Dreamwidth Studios